HOMESERVICESELECTRICALEMERGENCY POWERMECHANICALPV SYSTEMSCOMPLETED PROJECTSCONTACT US

 

Planning and Design Inc. can design your emergency power plant with redundancy to ensure that power is not lost to essential systems during commercial power brownouts and blackouts. Implementing reliable power plants for IT and commercial facilities is critical. Reviewing a facilities existing electrical infrastructure is paramount to understanding which circuits are to be placed on a standby or emergency generator. Working closely with your team, will dictate which type of generator is to be used, as well as, the size, secure placement, and fuel storage requirements. Installing a UL rated fuel tank at your facility provides confidence in knowing your fuel supply will have an added layer of leak protection from the outside elements. 

genset5.JPG
UL 2085 DATA CENTER FUEL TANK FARM
dcplantrectifier.jpg
-48VDC PLANT RECTIFIERS
UPS3.JPG
225KVA UPS WITH 30MINUTES OF BATTERY
dcplant.jpg
DC Plant Battery Strings
800KWGENSETINGA.JPG
OFF SITE GENERATOR PRE-QUALIFYING

~ ACHIEVING EXCELLENCE ~